| home about us free pdf software downloads links privacy site map copyright policy |
|
|
SubmissionToSenateInquiry
renewable energy, MRET, electricity, amendment bill, baselines, wind, production, ECITA References Committee, Senate ECITA References, RECs, hydro, Australia, industry, cost, Hydro Tasmania. Thank you for the opportunity to provide input to the Senate Environment, Communications, Information Technology and the Arts References Committee's Inquiry (the Inquiry) into the Renewable Energy (Electricity) Amendment Bill 2002 (the Amendment Bill). Hydro Tasmania has accepted the challenges introduced by the MRET and developed a major program of work to stretch the capability of existing assets to the economic maximum, and we believe that recent concerns raised about baselines are driven by our competitors' commercial positions rather than the baselines themselves. The potential for upgrade and redevelopment of existing hydroelectric schemes is a function of the age of the plant, condition of the plant, and the success of the original design. ecbrec http://www.nf-2000.org/publications/ecbrec.pdf renewable energy, utilisation, Poland, technologies, financing, energy, economy, preparation, Polish, installations, RES, policy, environment, power, plants. The research work titled ëEconomic and Legal Aspects of Utilisation of Renewable Energy Sources in Polandí was prepared by the EC BREC/IBMER under an agreement with the Ministry of the Environment and with the financing party ñ the National Fund for Environment Protection and Water Economy. The work was carried out as an element in the preparation process of the development strategy of renewable energy sources in Poland as part of the execution of the Resolution of the Lower House of the Polish Parliament (the Sejm) of 8 July *999 on the increase of utilisation of renewable energy sources (RES). 2.13baring-gould renewable energy, hybrid, design, Laboratory, National Renewable Energy, suite, hybrid system modeling, assessment, conducting, electrification, simulation, capabilities, planners, optimizing, technology. The National Renewable Energy Laboratory and University of Massachusetts have long been involved in the area of hybrid system modeling and over the last ten years have developed a suite of simulation models to answer these questions, weather for the design of a single electrification system, a large diesel power system or now, distributed generation technology. Whether conducting an options assessment looking at different technologies, optimizing hybrid systems designs or conducting detailed performance assessments, the NREL model suite provides a process to analyze the design space and provide detailed information to project planners and developers, a key step in any rural electrification program. 0305_Fiji_JV hydro, energy, water, Pacific Hydro, hydroelectric station, electricity, wind, Fiji, pipeline, renewable energy, Australia, FEA, water treatment, Viti Levu, wind farm. Renewable energy generator Pacific Hydro Limited [ASX: PHY] today announced the formation of a Joint Venture company with the Fiji Electrical Authority (FEA), the Fiji Government electricity company, to develop up to 100 megawatts (MW) of hydro and wind generation capacity in Fiji. The new company, Sustainable Energy Limited, is aiming to save up to F$10 million per year in foreign exchange by replacing diesel imports for electricity generation with Fiji's indigenous renewable energy resource of wind and water. "We will initially be developing a 6.5 MW hydroelectric station at Wainikasou and a 3.0 MW hydroelectric station at Vaturu. The treatment works and pipeline are currently being upgraded by Public Works in Fiji to meet growing water demand. philmission http://www.wwf.org.uk/filelibrary/pdf/philmission.pdf energy, renewable energy, Philippines, investment, mission, WWF, power, government, technology, trade mission, support, private sector, representatives, local communities, high level. Vincent Peres and the Philippines Department of Energy together with WWF Philippines. 1 The rapidly changing investment climate for renewable energy in the Philippines and the efforts of the Philippines government to promote renewable energy as an investment priority. Details on specific investment and project development opportunities in the field of The Mission will be composed of the Energy Secretary and senior representatives of Philippines DoE, senior representatives from the private sector intending to pursue the development of renewable energy and WWF Philippines. Earlier this year the country passed a new Electric Power Industry Reform Act, complemented with a package of investment incentives designed to fast-track renewable energy. renew http://home.att.net/~africantech/renew.PDF energy, solar, electrification, cost, industry, Ghana, RETs, market, grid, policy, manufacturing, financing, communities, photovoltaics, technologies. Although renewable energy technologies (RETs) have been in use in Ghana for many years, they have not seen much commercial success. Using solar PV as an example, this paper attempts to explain some of the factors that have prevented growth of a viable market for RETs. The achievable levels of penetration for each of the market groups will depend on the marketing efforts of solar energy companies as well as incentives provided by government programs and financing schemes. 4.2 Rural electrification The National Electrification Scheme (NES) has been a largely successful government program initiated with donor assistance in 1989 with a goal of extending the grid throughout the country by 2020. renenergies http://www.skal.org/pdf/ingles/renenergies.pdf energy, water, costs, technology, maintenance, installing, electricity, grid, power, businesses, designs, metres, wind, suppliers/contractors, generator. The majority of tourism businesses are of small and medium scale, and these are the most likely to be found in rural areas where basic information about energy alternatives may not be available. By using renewable energy sources, tourism businesses will save on costs, improve efficiency and service, contribute to the conservation of the environment, and generate benefits for local communities. Remote systems are a better option when: business is located more than 400 metres from the grid costs of extending the power lines are higher than the capital costs of the PV system. For times when neither the PV modules nor the wind turbine are working (at night and during low winds), battery storage and/or a diesel generator is included. open_sol_rview_pol_drft review, proposals, renewable energy, staff, RAC, review process, criteria, funding, Open Solicitation, approvals, agenda, recommends, requests, advisory council, Fund. To clarify and establish a formal review process for renewable energy projects proposed through the Open Solicitation Program. The FY '03 budget approved by the board Sept. 27, 2002, includes $925,000 for unsolicited proposals, representing less than 10% of funds allotted for renewable energy projects. The staff review includes resource, engineering and financial data as appropriate to evaluate project feasibility and chances for success. Of the remaining 16, six were rejected (two after review by the RAC), two have been approved by the board after RAC review, three are coming to the board for approval after review by the RAC, one was approved by the staff after informal RAC conversation and four are in the review phase. 18-12-2002 Eurec energy, technologies, medium, integration, fuel, renewable energy, fuel cells, biomass, research actions, sustainability, renewable energy sources, biofuels, production, long-term, policy. Model and tool development to study social and economic issues related to new energy technologies: energy external costs social issues related to implementation of energy technologies, incl. Topics and areas are given in the Call text There are no thresholds for the size of the project but there are 19 topics for new instruments and 23 areas for STRPs and the budget of the Call is given Previous submission of an EoI will have no bearing on the proposal evaluation. There may be competition between proposals across and within topics and areas. Senate Env 04122002 REGA, industry, renewable energy, target, Senate Committee, review, Rae, generators, MRET, endorse, Bill, Inquiry, Australia, legislation, report. The Renewable Energy Generators of Australia Ltd (REGA) welcome the findings of the Senate Inquiry into the Renewable Energy (Electricity) Amendment Bill 2002. REGA welcomes the Committee's observation that the 9500GWh target is no longer a genuine 2% target, and that this should in fact be 13,500GWh. "REGA has consistently opposed calls from some sections of the industry to make wholesale policy changes to the Bill. "Our members have also consistently maintained that the MRET statutory review process is the appropriate mechanism to consider whether the measure is delivering its objectives in an efficient and effective manner -- I am delighted for the sake of investment in the industry that the Senate Committee agrees," Mr Rae said.
|